Club Working Bee – Sunday 10th November

  • When — Sunday 10th November 2013
  • Start Time —  10am (meet 9am at the Hoppet Office if you want to car pool)
  • Place — Clubhouse

TASKS

1. Clubhouse

  • General spring clean including the skidoo/wax shed
  • Maintenance welding of skidoo trailers located at the clubhouse (offers of help from welding experts needed).
  • We have a couple of rolls of good secondhand carpet that could be used to cover the floor of the balcony area that is now enclosed – south side (offers of help from carpet laying experts needed).  This area will be trialled in 2014 as the childrens area.

2. Race Hut

  • Removal of large bench and replace with trestles
  • Stock take of: 1. aluminium poles and the straightening of bent poles, 2. star pickets, 3. fencing & bunting and 4. signage
  • Other — sweep downstairs & upstairs (clean windows), clean up rubbish inside and under the Hut.

Requirements for Race Hut clean up — 6 workers, a trailer, welding equipment (skidoo trailers), hammers, vices for pole straightening, metal hammer plates to use to straighten aluminium poles. RSVP for Race Hut volunteers by Thursday 7th Nov. – to Paul L’Huillier:  Mob: 0400 056 247, Email: <paullhuillier@bigpond.com>

Bring — Hat and sunscreen

Sausage sizzle provided by club at end of working bee. For catering purposes please RSVP to Bron Gray by Thursday 7th Nov : Mob: 0402 105 237 or Email: <bron.gray@ibag.com.au>.

This entry was posted in Information. Bookmark the permalink.